Black Friday Lifetime AITenders R3,990 once · Only 49 left · Ends Mon 30 Nov
Claim lifetimeSeeking a specialist service provider to deliver a Probabilistic Seismic Hazard Assessment for the proposed Multi-Purpose Reactor site at Pelindaba, including the PSHA chapter for the Site Safety Report and a NEMA EIA addendum. Work must be completed within 12 weeks, and experience with nuclear or similarly regulated sites is required.
Necsa, the South African Nuclear Energy Corporation SOC Ltd, is procuring a Probabilistic Seismic Hazard Assessment (PSHA) for the proposed Multi-Purpose Reactor (MPR) site at its Pelindaba complex. The study will provide design-basis seismic inputs for the reactor design, the Site Safety Report (SSR), the Environmental Impact Assessment (EIA) and the Public Information Document (PID). The service provider must consider the available seismic hazard, geotechnical and geophysical information relevant to the Pelindaba site, and produce a PSHA chapter for the SSR that complies with South African nuclear regulatory requirements and international standards. The provider must also prepare an addendum that closes identified gaps against the National Environmental Management Act (NEMA) requirements for the EIA.
The scope requires a structured, traceable deliverable set. The inception package must set out the methodology, information needs, responsibilities, interfaces and a detailed study programme. A requirement evaluation log must record applicable requirements, available evidence, adequacy assessment, justification and identified shortcomings. The draft and final reports and handover package must include the SSR PSHA report and the EIA addendum report. Reports and registers must be supplied in editable Word and Excel formats, together with final signed PDF copies. The work must also include an indexed register of sources, a register of supporting records used in generating the assessment, and a register documenting review comments and their resolution. Compliance must be evaluated and demonstrated against, among others, Regulations R.927 (2011) and R.388 (2006), NNR guidance documents RG-0011, PP-0014 and RG-0016, IAEA SSR-1 (2019), IAEA SSG-9 Rev 1, IAEA SSG-89, Necsa's SHEQ-INS-0824 Seismic Evaluation Strategy, and NEMA Act No. 107 of 1998 as amended in 2014. Existing seismic, geological, geotechnical and geophysical reports for Pelindaba, including prior PSHA and geotechnical studies for the PBMR and DIPR projects and the MPR site investigations, will be provided as inputs. The final reports must be completed within 12 weeks of commencement, subject to timely access to records, personnel and the site. Any constraint affecting completion must be reported to Necsa promptly, with its implications and a proposed resolution.
Bidders must submit a priced breakdown covering mobilisation, specialist personnel, reporting, disbursements and applicable taxes. Work outside the approved scope may not be charged without prior written authorisation. Under Necsa's terms and conditions, payment is made after acceptance of deliverables, with a seven-day evaluation period for each deliverable, and invoices are paid within 30 days of a correct statement. Penalties apply for late delivery, and a retention fee of up to 10% may apply. Preference must be given to Black Empowerment Companies for any subcontracting. A valid original SARS tax clearance certificate is required before award, and service providers must sign a confidentiality agreement and ensure their staff are bound by Section 51 of the Nuclear Energy Act, 1999. The standard bid documents, the Standard Bidding Document (SBD) and Necsa's Safety, Health, Environment, Quality (SHEQ) procedures, including alcohol and drug control, also apply. Note that the programme and final dates will be set upon contract award. The tender is currently in draft status, so bidders should confirm the final published documents and closing details on eTenders before submitting.
This tender is best suited to seismology and engineering geophysics consultancies with probabilistic hazard experience, geotechnical engineering firms with seismic and nuclear site expertise, and engineering consultancies with nuclear safety licensing experience (NNR and IAEA frameworks). Environmental consultants with NEMA EIA experience may be suitable as a joint venture partner for the EIA addendum. Applicants should be able to demonstrate prior PSHA work for nuclear or similarly regulated facilities, the capacity to deliver within a 12-week timeline, and a valid SARS tax clearance certificate. Black Empowerment Companies are encouraged to apply, as Necsa gives preference to them in subcontracting. Small firms without nuclear or regulatory experience are unlikely to meet the requirements unless they form a partnership with a qualified specialist.
Starter gives you this tender's documents, requirements, location and buyer contacts, plus every new tender matched to your business, for R199/month.
Cancel anytime · No contract · Secure checkout by Paystack
See your matched tenders before you pay, then get their documents and buyer contacts straight away. Cancel anytime, no contract.