Black Friday Lifetime AITenders R3,990 once · Only 49 left · Ends Mon 30 Nov
Claim lifetimeSupply, delivery and offloading of railway ballast for PRASA's Metrorail Gauteng region on an as-and-when-required basis over 36 months. Includes SABS 1083-compliant stone and TLB and front-end loader plant with operators. Compulsory briefing 5 Nov 2026; closes 26 Nov 2026.
The Passenger Rail Agency of South Africa (PRASA) is seeking a service provider for the supply, delivery and offloading of railway ballast across the Metrorail Gauteng region, on an as-and-when-required basis for 36 months. Ballast is essential to track performance: it bears and distributes load, facilitates drainage and controls vegetation. PRASA reports that screening has not been carried out for a long time, that some areas face ballast shortages caused by washaways, lifespan degradation and contamination from illegal dumping, and that the Permanent Way department's on-track rehabilitation machines (ballast screening, tamping, track stabilising and ballast regulating) depend on a steady supply. The contract is rates-based with no guaranteed minimum volume, and the estimated ceiling in the draft contract is R693,393.51 (VAT inclusive). Deliveries must be made within 14 calendar days of a Purchase Order from the PRASA Technical Officer, and work may be required during weekends and public holidays.
The scope covers ballast stone that complies with SABS 1083 (latest revision) and the specification in Annexure 4. Key technical requirements include a Los Angeles abrasion value of no more than 22%, a flakiness index of no more than 30%, voids of at least 40%, a relative density of at least 2.5, a sodium sulphate soundness loss of no more than 5% after 20 cycles, and a mill abrasion value of no more than 7%. Grading must meet the heavy axle line (S1) requirements. Stone must come from a quarry approved by PRASA, and the successful bidder must conduct and report ballast tests, supply three monthly samples for laboratory testing, and meet PRASA's random testing at the bidder's cost. Ballast is loaded into AY wagons at the siding or onto road trucks where wagons are unavailable. Payment is per cubic metre for material and per cubic metre per kilometre for road haulage (measured from the approved quarry to the offloading siding), and per hour for plant. Bidders must provide the TLB (4x4, minimum 1 m³ bucket) and front-end loader (4x4, minimum 2 m³ bucket) with qualified operators, maintain the plant, and replace broken-down equipment within two to four hours. Operators must hold a Code C1 licence, plant operation certification and at least three years' experience. Bidders must also supply a Health and Safety file approved by PRASA, a site-specific safety plan for a railway environment, a delivery schedule and a Microsoft Project or equivalent programme. Penalties for late completion are 0.05% of the contract price per day, capped at 10%.
Evaluation uses a two-envelope process. Stage 1 checks mandatory documents, including a completed pricing schedule (Annexure 5), attendance at the compulsory briefing and a COID letter of good standing, a valid SARS PIN and CSD registration. Stage 2 is functionality, scored on track record: at least one similar supply project of R500,000 or more with appointment and completion letters, rising to five projects for full marks. Bidders must reach 80% to proceed. Stage 3 scores price (80 points) and specific goals (20 points), and the 90/10 preference system is indicated in the preference form. Mandatory dates are the compulsory briefing on 5 November 2026 at 10:00 at the PRASA Shosholoza Meyl Junction offices in Braamfontein, the question deadline of 10 November 2026 and the closing date of 26 November 2026 at 12:00. Bidders should note that some background sections of the RFP refer to service road rehabilitation, which appears inconsistent with the ballast-specific specification. Clarifications should be sought through the formal clarification process before the question deadline.
Quarry operators and aggregate suppliers able to produce SABS 1083-compliant ballast and provide the required laboratory test reports; haulage and transport companies capable of road delivery and wagon loading; and plant hire companies able to supply 4x4 TLB and front-end loader units with certified operators. Civil or rail maintenance contractors with a track record of similar supply projects of R500,000 or more are well placed, as are EME or QSE suppliers who can subcontract or form a joint venture to meet the functionality threshold. Businesses without access to an approved quarry, without suitable plant, or without the required supply references should consider whether they can meet the 80% functionality threshold before bidding.
Starter gives you this tender's documents, requirements, location and buyer contacts, plus every new tender matched to your business, for R199/month.
Cancel anytime · No contract · Secure checkout by Paystack
See your matched tenders before you pay, then get their documents and buyer contacts straight away. Cancel anytime, no contract.